Migration patterns

Status: AI draft, 2026-11-16. Not yet verified by me. Written from AWS Prescriptive Guidance, the AWS DMS documentation and Martin Fowler's strangler fig pattern; general practice, no commands run.

In one line

Pick how much to change (rehost, replatform or refactor), separate state from compute, rehearse on a copy, keep old and new in sync while you compare them, cut over in the smallest steps the system allows (gradual beats big bang), keep a tested way back until the old system is decommissioned.

The plain idea

A migration replaces something that works with something that should work better, while users keep using it. The danger is not the new system; it is the moment of switching, and the data that has to arrive intact on the other side. Good migrations make that moment small, rehearsed and reversible: run old and new side by side, prove they behave the same, move traffic a little at a time, and only remove the old system when nobody could need it back.

How it works

How much to change

AWS's prescriptive guidance lists seven strategies (the "7 Rs"): retire, retain, rehost, relocate, repurchase, replatform, and refactor or re-architect. The three that matter most for engineers:

Strategy What changes Example Trade-off
Rehost ("lift and shift") Nothing in the app; new infrastructure VM image moved to EC2 Fast, low risk, few cloud benefits
Replatform Some components swapped for managed or containerised ones App moved to containers on EKS; self-run database to RDS Moderate effort, real operational gains
Refactor The application's architecture Monolith split into services, or moved to serverless Most benefit, most effort and risk; AWS's guidance does not recommend it for large migrations

Do one kind of change at a time where you can: moving and redesigning simultaneously doubles the unknowns.

Moving a stateful service from VMs to containers

flowchart TD
    A["1. Separate state from compute: data in a managed DB,<br/>files in S3 or EFS, config and secrets external"] --> B["2. Package the app as an image;<br/>same version, same config, new runtime"]
    B --> C["3. Rehearse on a copy: restore production data<br/>to staging, run the full flow"]
    C --> D["4. Run both in parallel: sync data,<br/>compare outputs (parity checks)"]
    D --> E["5. Cut over traffic in steps,<br/>watch, keep the old path warm"]
    E --> F["6. Decommission the old system<br/>after a soak period"]
  • Separate state first. Containers are replaceable; anything written to the local disk is lost on restart. Move data to a database, files to object or shared storage, configuration and secrets to external stores (ConfigMaps and Secrets, Secrets management).
  • Rehearse on a copy of real data and traffic patterns. The first run always finds something: a hard-coded path, a missing file permission, a cron job nobody documented.
  • Parity checks: compare the old and new systems' outputs on the same inputs (record counts, checksums, API responses, business metrics). "It started" is not "it works the same".

Cutover styles

Style How Risk Rollback
Big bang Everything switches at one moment Highest; all problems appear at once Hard once new data is written
Blue-green New system complete beside the old; switch traffic in one step Medium Switch back, if data is still in sync (Deployment strategies)
Gradual (strangler fig) Route one function, endpoint or customer group at a time to the new system; the old one shrinks Lowest per step Route that slice back

The strangler fig pattern (named by Martin Fowler) puts a routing layer (a load balancer, API gateway or mesh) in front of the old system and moves capabilities behind it one by one until the old system can be removed (Load balancers and proxies).

Data migration and sync

  • Full load, then change data capture: copy everything once, then replicate ongoing changes until cutover. AWS DMS calls this ongoing replication or change data capture (CDC); databases also have native replication.
  • At cutover: stop writes on the old side (or switch writers), let replication catch up, verify counts, switch.
  • Reverse replication (new back to old) after cutover keeps a real rollback option open for a while.
  • Schema changes follow expand and contract, so both versions can run against the data during the transition (Deployment strategies).

The rollback plan, and a rollback drill

Write the rollback before the cutover, and practise it: switch traffic back in staging, under time pressure, and measure how long it takes. A rollback plan that has never run is a hope (Change management).

Decommissioning

The migration is not finished until the old system is gone:

  1. Soak period with the old system idle but restorable.
  2. Final backup or snapshot, kept per the retention policy (Backup and disaster recovery).
  3. Remove DNS records, load balancer rules, credentials, IAM roles, firewall rules, monitoring and alerts that pointed at it.
  4. Delete the resources, and confirm the cost actually drops (Cost optimisation).

A concrete example

sample-app's order service moves from two VMs to EKS:

  1. Uploads move from the VM disk to S3; the database is already RDS; configuration becomes a ConfigMap, secrets come from Secrets Manager.
  2. The same version is containerised; staging runs it against a restored copy of production data; two undocumented cron jobs are found and turned into CronJobs (Jobs and CronJobs).
  3. In production the ALB sends 5% of requests to the EKS target group, then 25%, 50%, 100% over a week, with error rate and latency compared per target group (ALB and NLB).
  4. Rollback is one listener change, drilled in staging (2 minutes).
  5. After two weeks at 100% with the VMs stopped, a final snapshot is taken and the VMs, their security groups and their alarms are deleted.

Why not just...?

  • ...move and redesign in one step? When it breaks, you cannot tell whether the platform or the redesign is at fault. Move first, improve after.
  • ...do a big-bang weekend cutover to get it over with? Every problem surfaces at once with no partial fallback, and data written after the switch makes rollback hard. Use gradual cutover where the system allows.
  • ...keep the old system "just in case" indefinitely? It keeps costing money, keeps credentials alive and drifts out of date until it cannot be a fallback anyway. Set a decommission date.

How it breaks

Symptom Layer Check Likely cause
Data missing after cutover Sync Replication lag, row counts Cut over before replication caught up; writes still going to the old side
New system works in tests, fails in production Rehearsal Differences from staging Rehearsed without real data volume or real traffic patterns
Rollback impossible Data Writes since cutover No reverse replication; schema changed irreversibly
Jobs stopped running after the move Hidden dependencies Old host's cron, scripts Undocumented jobs on the old servers
Old system still billed months later Decommissioning Cost by resource No decommission plan or date

Interview questions

1. What are rehost, replatform and refactor?

Answer
  • Rehost: move as is to new infrastructure.
  • Replatform: swap some components for managed or containerised ones without redesigning the app.
  • Refactor: change the architecture; most benefit, most effort and risk.

2. How would you move a stateful service from VMs to Kubernetes?

Answer
  • Separate state first (database, object storage, external config and secrets), then containerise the same version.
  • Rehearse on a copy of production data; run old and new in parallel with parity checks.
  • Shift traffic gradually with a drilled rollback, then decommission.

3. What is the strangler fig pattern?

Answer
  • A routing layer in front of the old system sends one capability at a time to the new system.
  • The old system shrinks until it can be removed.
  • Each step is small and reversible.

4. How do you migrate a database with minimal downtime?

Answer
  • Full load, then ongoing replication (change data capture) until cutover.
  • At cutover: stop writes, let replication catch up, verify, switch the application.
  • Keep reverse replication for a while as a rollback path.

5. What does a good rollback plan for a migration contain?

Answer
  • The trigger (what result means roll back), the exact steps, who decides, and the time it takes.
  • How data written after cutover gets back to the old side.
  • Evidence it works: a drill in staging.

6. When is a migration finished?

Answer
  • When the old system is decommissioned: soak period over, final backup kept, DNS, credentials, rules, alerts and resources removed.
  • And the cost and access reductions are confirmed.
  • Until then, the old system is a risk and a cost.

Try it

  1. Pick a service you know and write which of the 7 Rs fits it, and why not the others.
  2. Write the cutover plan for moving it with a gradual traffic shift: steps, checks, rollback trigger.
  3. List everything you would remove when decommissioning its old environment.

Zoom out

Migrations combine most operations skills: change management, deployment strategies, data protection and decommissioning (Change management, Deployment strategies, Backup and disaster recovery). In interviews, a migration story with parity checks and a drilled rollback shows judgement more than any tool list (STAR stories).