Change management

Status: AI draft, 2026-11-16. Not yet verified by me. Written from the Google SRE book and the AWS Well-Architected operational excellence pillar; general practice, no commands.

In one line

Most outages follow a change, so make changes small, reversible and observable: record the current state, write the rollback and check the blast radius before; roll out in stages and verify each one during; soak, confirm and document after. Review in proportion to risk.

How it works

The Google SRE book reports that roughly 70% of outages are due to changes in a live system, and names three practices that limit the damage: progressive rollouts, quick and accurate detection of problems, and safe rollback. AWS's operational excellence design principles say the same in other words: make frequent, small, reversible changes.

flowchart TD
    B["Before: current state recorded, rollback written,<br/>blast radius checked, window chosen"] --> D["During: first stage (canary, one host,<br/>one environment), verify"]
    D -->|"healthy"| N["Next stage, verify again"]
    D -->|"unhealthy"| R["Roll back, using the written steps"]
    N --> A["After: soak, read back the result,<br/>update docs and the change record"]

Before

  • Record the current state (configuration, versions, counts) so you can compare and restore.
  • Write the rollback steps before the first command, and know how long they take. If you cannot roll back, say so explicitly and plan more carefully.
  • Check the blast radius: what exactly will this touch? List the objects a selector or a plan affects (Reading a plan, Labels, selectors and namespaces).
  • Pick a window when people are available and traffic is lower, and avoid stacking several changes at once.

During

  • Stage the rollout: one canary, one host, one zone, one environment, then more (Deployment strategies).
  • Verify after each step against the signals that matter (error rate, latency, the specific function changed).
  • Stop at the first unexpected result; do not "push through".

After

  • Let it soak long enough for slow problems (memory leaks, daily jobs) to appear.
  • Read back the result: the actual configuration, not what the command said it did.
  • Update runbooks and the change record; tell the people who need to know.

Reversible steps first: order work so the early steps are easy to undo (add before remove, expand before contract, deploy dark before enabling). The irreversible step comes last, once everything else is proven (Migration patterns).

Review in proportion to risk: a typo fix needs a quick review; a database engine change needs a written plan, a rehearsal and an approver. Automated changes through reviewed pipelines (GitOps, Terraform plans) carry their own evidence (GitOps principles).

Interview questions

1. Why do changes cause most incidents, and what reduces the risk?

Answer
  • Systems are stable until something changes; the SRE book attributes roughly 70% of outages to changes.
  • Progressive rollouts, fast detection and safe rollback limit the damage.
  • Small, frequent, reversible changes keep each one easy to understand and undo.

2. What do you do before making a risky production change?

Answer
  • Record the current state and write the rollback steps.
  • Check exactly what the change touches; rehearse in a lower environment.
  • Choose a window, tell the people affected, and have monitoring open.

3. What does "reversible steps first" mean?

Answer
  • Order the work so early steps can be undone easily: add before removing, expand before contracting.
  • Leave irreversible steps (deleting old data, decommissioning) to the end, after verification.
  • Each stage leaves a safe stopping point.

4. How much review should a change get?

Answer
  • In proportion to risk and reversibility, not one process for everything.
  • Low-risk changes through automated, reviewed pipelines; high-risk ones with a written plan, rehearsal and approval.
  • Too much process for small changes pushes people to batch changes, which is riskier.

5. A change went wrong halfway through. What now?

Answer
  • Stop, assess impact, and follow the written rollback, or declare an incident if users are affected (Incident response and postmortems).
  • Do not improvise further changes under pressure without coordination.
  • Afterwards, review why the plan missed it.